The Chaoshan area in Guangdong continues to be high -temperature weather. According to netizens, the backfield bridge of Chaoyang District, Shantou City has arched and cracking.Relevant local departments confirmed that the situation is true, and at present, it has entered the sealing phase of repair.

According to the Yangcheng Evening News, the Transportation Bureau of Chaoyang District, Shantou City and the Chaoyang Branch of the Chaoyang Branch of Shantou City recently issued a notice on the implementation of traffic control on the X052 Cao South Line of Chaoyang District.The notice stated that at 7 pm on July 11, due to the recent high temperature weather, the bridge panel and the seams of the panels of the X052 Cao South Line were arched, cracking, and the tilt of the anti -collision bar.Hidden dangers.In order to ensure the safety of road traffic and ensure the safety of the people of the general public, the bridge is required to be repaired by the Housian Bridge.

The announcement said that from July 12th to August 21st, the bridge was repaired for the bridge for 40 days.If the construction of the above section of the project is postponed, the traffic control will be extended to the end of the completion of the project.

The notice reminds the general public at the same time that the relevant vehicles are requested to avoid the construction section of the construction section during the repair period of the bridge.Automatically lift.